A&E and Custom Manufacturing IRC Section 41 Playbook: Surviving IRS Funded-Research Audits & Form 6765 Section G

For architecture, engineering and custom machine firms, the R&D credit is won or lost on two questions: did the firm bear the financial risk of failure and keep substantial rights in the results, and can it show the experimentation project by project. Contracts billed on time and materials are commonly treated as funded research under IRC § 41(d)(4)(H). A contract-by-contract review before filing typically protects more credit than any other step.

Sheet codeP-09
Sheet043 / 062
Revision2026-11-06
DisciplinePlaybooks
~7.9%
Federal net Section 41 credit on total QRE (ASC, after § 280C)
effective range ~6.5%-9.2%
65%
Share of US contractor research spend counted as QRE
where you keep rights and bear risk
$8,500 + $1,200
Fixed-fee study benchmark: base plus per business component
typically $12,000-$28,000
25%
Typical contingency fee on gross credit
house benchmark for comparison

01The four-part test, applied to design work

Under IRC § 41(d), a business component qualifies only if the activities meet all four tests. A&E work can meet them, but the evidence looks different from a lab notebook.

  1. Section 174 test. The costs must be research or experimental expenditures under § 174, meaning they aim to eliminate uncertainty about the capability, method or appropriate design of a product or process.
  2. Technological in nature. The work relies on principles of engineering, physical sciences or computer science. Structural, MEP, geotechnical and machine design work normally passes.
  3. Elimination of uncertainty. At the outset, the firm did not know how to achieve the result, or which design was appropriate. Routine application of code tables to a standard building usually fails here.
  4. Process of experimentation. Substantially all of the activities, measured as 80% or more, involve evaluating alternatives through modeling, simulation, iteration or testing.

Courts have looked hard at the fourth test. In Little Sandy Coal, the Seventh Circuit in 2023 required the taxpayer to show what share of its activities were experimental, not just that some were. In Meyer, Borgman & Johnson, a structural engineering firm's claim failed in the Tax Court, affirmed by the Eighth Circuit in 2024, largely because its records did not show a process of experimentation. Final sealed drawings show the answer; the credit depends on documenting the alternatives rejected on the way to it.

The shrinking-back rule helps: if a whole project does not qualify, the test applies to the next most significant subset, such as a novel connection system or a custom mechanical design within the building.

02Funded research: why contract terms decide the credit

IRC § 41(d)(4)(H) excludes research funded by another person. Under Treasury Regulation § 1.41-4A(d), research performed for a client is funded unless the firm both bears the financial risk of failure and retains substantial rights in the results. Both prongs are read from the contract.

  • Financial risk. If the firm is paid regardless of whether the design succeeds, it does not bear the risk. Courts in Fairchild Industries and later Geosyntec Consultants (Eleventh Circuit, 2017) focused on whether payment was contingent on success. Time-and-materials and cost-plus contracts are the most exposed.
  • Substantial rights. If the client takes all rights and the firm cannot use the results without paying, the firm lacks substantial rights. Retaining the right to reuse methods, details and know-how commonly satisfies this prong even where the client owns the drawings.
  • Fixed-price and rework clauses help. In Populous Holdings, the Tax Court in 2019 declined to treat an architecture firm's work as funded at summary judgment, pointing to contract terms that could require the firm to correct deficient work at its own cost.
Contract types and their typical funded-research exposure
Contract typeFinancial risk prongTypical exposureWhat to check
Fixed price or lump sumUsually borne by firmLowerRework at own cost; payment tied to acceptance
Fixed price per phaseBorne per phaseLower to moderateWhether failed phases are still paid
Time and materialsUsually borne by clientHighAny not-to-exceed or acceptance conditions
Cost-plus or hourly not-to-exceedMostly clientHighWhether overruns above the cap are unpaid
Internal or speculative designFirmLowDocumentation of the project and its costs

Custom machine builders face the same analysis. A machine sold at a fixed price with acceptance testing at the customer's plant usually leaves the builder at risk; a design-only engagement billed hourly usually does not. Read the payment, acceptance and IP clauses of each contract, not the summary in the project system.

03Form 6765 Section G and refund claim documentation

The revised Form 6765 adds Section G, which asks for information by business component: what it is, the type, the information sought to be discovered, and the wages, supplies and contract research costs tied to it. The IRS phased Section G in, making it optional for early tax years and exempting certain small taxpayers. Check the current instructions for the year you are filing.

Refund claims already carry a similar burden. IRS Chief Counsel guidance issued in 2021 requires a refund claim to identify each business component, the research activities performed, the individuals who performed them, and the information each sought to discover, along with total qualified expenses. Missing items can make a claim invalid before anyone reviews its merits.

Evidence to keep per business component for an A&E or custom manufacturing claim
ItemA&E exampleWhere it usually lives
Business componentLong-span transfer structure for a specific projectProject list and proposal
Uncertainty at outsetUnknown whether the target depth could carry the load within deflection limitsDesign criteria memo, kickoff notes
Alternatives evaluatedThree framing schemes modeled and comparedAnalysis model versions and calc packages
Who did the workNamed engineers and hours by projectTimesheets coded to project and phase
Contract termsLump-sum agreement with rework clauseSigned owner agreement
CostsWages, supplies, 65% of US subconsultant research costPayroll and AP by project

04Cost model: a 60-person structural and MEP firm

Figures follow the house formula: total QRE = qualified wages + supplies + 65% of US contractor research spend, with foreign contractors excluded.

  • Qualified W-2 wages: $1,800,000. Prototype and testing supplies: $40,000. US subconsultant research spend: $300,000 x 0.65 = $195,000.
  • Total QRE: $1,800,000 + $40,000 + $195,000 = $2,035,000.
  • Federal net credit at about 7.9%: $160,765.
  • State credit, modeled at an illustrative 3% effective rate: $61,050. Combined credit $221,815.

The funded-research haircut. Suppose a contract review finds 40% of those wages were on time-and-materials contracts that would likely be treated as funded. Removing $720,000 of wages gives QRE of $1,315,000 and a federal credit of $103,885, a drop of $56,880. Claiming it anyway invites an audit adjustment plus penalties and interest; finding it before filing protects the rest of the claim.

Fee comparison. A 25% contingency fee on $221,815 is $55,454. A fixed-fee study at $8,500 plus 12 business components at $1,200 is $8,500 + $14,400 = $22,900, saving $32,554 in the first year. Model your own figures in the R&D credit and Section 174 calculator, and compare fee models in the contingency vs fixed-fee comparison.

05Section 174A, offshore drafting and the timing of deductions

The credit is only half of the tax picture. Under Section 174A, domestic research and experimental expenditures can again be deducted in the year paid, for tax years beginning after 2024. Foreign research spend remains capitalized and amortized over 15 years, which with the mid-year convention allows only about 3.33% in year one.

That matters for A&E firms using offshore drafting or modeling bureaus on qualifying projects. On $200,000 of offshore spend that is research under § 174, the year-one deduction is about $6,660 instead of $200,000. At a 21% corporate rate, that is a year-one cash-tax difference of about $40,600, the house benchmark of roughly 20.3% of foreign R&E spend. Foreign contractor spend also earns no Section 41 credit.

Two coordination rules to raise with your tax adviser: the § 280C reduction, which requires either reducing the deduction by the credit or electing a reduced credit, and any transition elections available for prior-year unamortized domestic costs. These change year to year; confirm current treatment before filing.

Firms with staff in several countries should also check each jurisdiction's own incentive; see the UK R&D relief guide and the Canada SR&ED guide.

06Phased checklist for a defensible A&E claim

During the year

  • Code timesheets to project and phase so wages can be tied to business components.
  • Save model versions and design alternatives, not just final calculations.
  • Use contract templates with rework-at-own-cost and retained know-how clauses where commercially possible.

Before the study

  • Pull every contract on candidate projects and classify funded-research risk.
  • Shortlist business components where real uncertainty existed at the outset.

During the study

  • Technical narratives written or reviewed by the engineers who did the work.
  • Section G data prepared per business component, even if optional for your year.
  • Separate domestic and foreign spend for Section 174A treatment.

After filing

  • Keep the study, contracts and source records for the statute of limitations period.
  • Feed lessons into next year's timesheet and contract templates.

07Run the numbers: iRC Section 41 R&D tax credit, Section 174A and contingency fee audit calculator

The same benchmarks as this sheet, with your inputs. Share link and printable brief open the full calculator page.

Benchmarks are typical 2025-2026 market ranges compiled by Engineer Aid, an independent desk not affiliated with the vendors named. Quotes vary by region, volume and timing; nothing here is legal, tax or engineering advice. Revised 2026-11-06.

Questions buyers ask

Can architecture and engineering firms claim the R&D tax credit?

Yes, when a project meets the four-part test of IRC 41(d) and the work is not funded research. The firm must bear the financial risk of failure and retain substantial rights in the results. Documentation of design alternatives and contract terms decides most claims.

What is funded research under Section 41(d)(4)(H)?

It is research paid for by another person, which is excluded from the credit. Under Treasury Regulation 1.41-4A(d), work for a client is funded unless the firm bears the risk of not being paid if the research fails and keeps substantial rights in the results. Time-and-materials contracts are the most exposed.

What does Form 6765 Section G require?

Section G asks for information by business component, including what the component is, the information sought to be discovered, and the wages, supplies and contract research costs tied to it. The IRS phased it in with optional years and exemptions for certain small taxpayers. Check the current instructions for your filing year.

How much does a fixed-fee R&D credit study cost compared with contingency?

A typical fixed-fee benchmark is $8,500 plus $1,200 per business component, usually $12,000 to $28,000 in total. A 25% contingency fee on a $221,815 credit would be about $55,454. Compare both against the documentation each provider will deliver.

Does offshore drafting count toward the R&D credit?

No. Foreign contractor spend earns no Section 41 credit, and foreign research spend must be amortized over 15 years under Section 174, with about 3.33% deductible in year one. Domestic research spend can be deducted in the year paid under Section 174A.

Related sheets

G-06 · Tool 04 · R&D creditIRC Section 41 R&D tax credit, Section 174A and contingency fee audit calculatorEstimate the IRC § 41 credit on engineering QREs, state credits, the Sec. 174 foreign amortization drag, funded-research risk and the fee saved with aC-12 · R&D credit fee comparisonContingency-Fee R&D Tax Credit Firms (25%) vs. Fixed-Fee PE-Led Form 6765 Studies: Cost & IRS Audit RiskA 25% contingency fee on a $230,535 R&D credit is $57,634; a fixed-fee study for 8 projects is $18,100. Breakeven is a $72,400 credit. Form 6765 auditA-09 · Offshore FTE auditIndovance CAD and BIM Outsourcing Audit: Dedicated FTE Monthly Pricing, Revision SLAs and Data SecurityAudit a dedicated offshore CAD/BIM FTE contract: $2,240-$4,160 monthly benchmarks, 18% US QA buffer, revision SLAs, ISO 27001 and Sec. 174 drag.P-03 · A&E firm playbookStructural & Civil A&E Firm Playbook: Subconsultant Markup Rules, Responsible Charge & Professional Liability DeductiblesSubconsultant markups, NCEES responsible charge and professional liability deductibles for A&E firms, with a worked $3.2M structural fee and risk modeJ-15 · United Kingdom guideUnited Kingdom (Engineering Council CEng / IEng): Merged RDEC R&D Tax Relief (20%), UK CAD VAR Pricing & Off-Payroll (IR35) Engineering RatesUK buyer guide: CEng and IEng are titles, not licences; the merged 20% R&D credit nets about 15%; ERIS, IR35 off-payroll costs and CAD seat conversionJ-16 · Canada guideCanada (PEO / EGBC / APEGA): P.Eng. Permit to Practice (CofA) Rules, SR&ED Federal/Provincial Tax Credits & Canadian CAD VAR RatesCanada buyer guide: PEO C of A and EGBC/APEGA permit rules, SR&ED 15% and 35% CCPC credits with the 80% contract rule, provincial credits and CAD in CJ-03 · State guide: TexasTexas (TBPELS) Engineering Guide: Mandatory Firm Registration, Windstorm Inspections, PE Seal Costs and Staffing RatesTexas engineering guide: TBPELS firm registration before you offer work, seal rules, coastal windstorm certification, 1.00x stamp fee math and franchi

Dispatch · enquiry

Send it to an independent auditor

Tell us what you are buying or renewing. Calculator results arrive here automatically, so there is nothing to retype. We reply from hello@engineeraid.com, usually within one business day.

  • Benchmark and redline review of a quote, MSA or engagement letter
  • Target price and a 2-3 vendor RFP scope
  • No sales calls from vendors: we are not a reseller or agency

By sending, you agree we may reply to the email given. See the privacy policy.