Engineering staffing agency vs. CAD/FEA outsourcing TCO calculator

Four delivery models, one landed cost each: a US staffing agency, a dedicated offshore CAD/FEA bureau, a vetted freelance marketplace and a turnkey US product development firm. The model includes temp-to-perm buyout fees, internal QA overhead and the Section 174 treatment of foreign R&E.

Sheet codeG-04
Sheet004 / 062
Revision2026-11-06
DisciplineCalculators
CheckedIndependent desk
+18%
US QA buffer on offshore billing
senior engineer / PE redlines
3.33%
Year-1 deduction on foreign R&E
15-yr amortization, mid-year

01The four landed-cost formulas

Agency = base × (1 + markup) × 173.3 hrs × months × FTE + buyout (22.5% of annual base if converted before 1,040 hrs) − § 41 credit (65% × spend × 7.9%, if R&D) Offshore = rate × 160 hrs × months × FTE × 1.18 + § 174 drag (billing × 21% × 29/30, if R&D) Marketplace= $68 × hours − § 41 credit (if R&D) Turnkey NPD= $165 × hours − § 41 credit (if R&D)

Offshore rates follow the discipline: $14/hr for 2D drafting and BIM, $18/hr for 3D CAD and PCB/controls CAD, $26/hr for FEA and CFD. The § 41 credit on US contractor spend assumes the contract leaves you the substantial rights and the financial risk; see the funded-research note on the R&D calculator.

02Worked example: three mechanical engineers for 12 months

Calc sheet · G-04.02House benchmarks · rev 2026-11-06

Defaults: $60/hr base, 52% markup, no conversion, work qualifies as R&E.

3 FTE × 12 months, mechanical / SolidWorks
ModelGrossAdjustmentsLanded
US staffing agency$569,088− $29,224 § 41 credit$539,864
Offshore 3D CAD FTE$103,680+ $18,662 QA + $21,047 § 174 drag$143,389
Freelance marketplace$424,320− $21,789 § 41 credit$402,531
Turnkey US NPD firm$1,029,600− $52,870 § 41 credit$976,730

The offshore route is cheapest on paper by about $396,000, but only if the work can be specified tightly, redlined within the 18% buffer and kept clear of export-control limits. ITAR-controlled technical data cannot go to foreign persons without authorization, which removes the offshore option entirely for many defense programs; see the aerospace and defense playbook.

03Temp-to-perm conversion fees

Set a conversion month to see the fee. Agency MSAs commonly charge 20%-25% of annualized base salary if you hire the engineer before a threshold, often 520 or 1,040 billed hours. The calculator applies 22.5% before 1,040 hours and switches the engineer to a direct cost of base × 1.3 (benefits and payroll burden) after conversion.

Conversion fee on a $60/hr ($124,800/yr) engineer
Converted atBilled hoursTypical fee
Month 3520$28,080 (22.5%)
Month 5867$28,080 (22.5%)
Month 71,213$0 if the MSA steps down at 1,040 hrs

The negotiation target is a sliding fee printed in the MSA that reaches zero by 520-1,040 hours. See the staffing MSA audit for the clause list.

Benchmarks are typical 2025-2026 market ranges compiled by Engineer Aid, an independent desk not affiliated with the vendors named. Quotes vary by region, volume and timing; nothing here is legal, tax or engineering advice. Revised 2026-11-06.

Questions buyers ask

What is a normal engineering staffing agency markup?

Engineering markups usually run 45% to 62% over the engineer's base pay. At $60/hr base and a 52% markup, the bill rate is $91.20/hr, about $189,700 per full-time year.

Why add 18% to offshore CAD costs?

Offshore drawings still need US senior engineer or PE review. Without redline SLAs and QA checklists that overhead runs 15%-25%; 18% is the planning figure for a well-run engagement.

How does Section 174 change offshore engineering cost?

Domestic research and experimental spend is deductible in year one under Section 174A, but foreign R&E must be amortized over 15 years, with only 3.33% deducted in year one. At a 21% tax rate that is a year-one cash cost of about 20.3% of the foreign spend.

Can I claim the R&D credit on agency or freelance engineers?

Generally 65% of US contractor spend can count as qualified research expense if you keep substantial rights to the results and bear the risk of failure. Foreign contractor spend does not qualify.

Related sheets

C-05 · Staffing markup comparisonActalent vs. Aerotek vs. Kelly Engineering vs. Randstad: Bill Rate Markups & Temp-to-Perm Buyout FeesEngineering staffing markups run 45%-62% on pay: $60/hr base becomes $91.20 at 52%. Compare Actalent, Aerotek, Kelly and Randstad on markup and buyout…C-06 · Offshore CAD comparisonIndovance vs. IndiaCADworks vs. Alpha CAD Service: Dedicated CAD/BIM FTE Rates, QA Buffers & SLAsOffshore CAD FTEs benchmark at $2,240-$4,160/month ($14-$26/hr). Add an 18% US QA buffer and, for R&D work, a 20.3% Year-1 Sec. 174 tax drag. Full…A-09 · Offshore FTE auditIndovance CAD and BIM Outsourcing Audit: Dedicated FTE Monthly Pricing, Revision SLAs and Data SecurityAudit a dedicated offshore CAD/BIM FTE contract: $2,240-$4,160 monthly benchmarks, 18% US QA buffer, revision SLAs, ISO 27001 and Sec. 174 drag.P-05 · Controls playbookIndustrial OEM, Robotics & PLC Controls Engineering Playbook: Commissioning Rates, Travel Per-Diems & Staffing MSAsControls and commissioning engineers bill $72-$165/hr plus overtime, per diem and travel time. Worked 3-week site model, MSA rate-card terms and…J-18 · India rate cardIndia Engineering GCC & CAD/FEA BPO Hub (Pune, Bengaluru, Hyderabad, Chennai): 2026 FTE Rate Cards, ISO 27001 Audits & Attrition SLAsIndia engineering rate card: 2D CAD $12-$18/hr, 3D and FEA $20-$32/hr, $1,950-$3,600 per FTE-month, GCC vs BPO, ISO 27001, attrition SLAs and US Sec…J-10 · Regional corridor guideOhio & Pennsylvania Industrial Corridor: COA Firm Licensing, Heavy Equipment FEA/CAD Outsourcing & PE Stamp BenchmarksOhio and Pennsylvania buyer guide: firm COA rules, PE stamp math ($2,600 per skid, $425 per extra state), $18-$26/hr offshore FEA and state R&D…
INDEPENDENT · AUDIT DESK · NO VENDOR FEES ·EAREV 2026

Dispatch · enquiry

Send it to an independent auditor

Tell us what you are buying or renewing. Calculator results arrive here automatically, so there is nothing to retype.

  1. 01Redline listEvery clause that carries cost, marked up against the benchmark.
  2. 02Target priceOne number per line, with the arithmetic shown.
  3. 03RFP scopeReady to send to two or three competing vendors.
Reply
≤ 1 business day
From
hello@engineeraid.com
Vendor fees
None, ever

By sending, you agree we may reply to the email given. See the privacy policy.