ENGINEERAID

Tool 02 · Staffing TCO

Engineering staffing agency vs. CAD/FEA outsourcing TCO calculator

Four delivery models, one landed cost each: a US staffing agency, a dedicated offshore CAD/FEA bureau, a vetted freelance marketplace and a turnkey US product development firm. The model includes temp-to-perm buyout fees, internal QA overhead and the Section 174 treatment of foreign R&E.

Sheet codeG-04
Sheet004 / 062
Revision2026-11-06
DisciplineCalculators
$91.20/hr
Agency bill at $60 base, 52% markup
≈ $189,700 per FTE-year
+18%
US QA buffer on offshore billing
senior engineer / PE redlines
3.33%
Year-1 deduction on foreign R&E
15-yr amortization, mid-year

01The four landed-cost formulas

Agency = base × (1 + markup) × 173.3 hrs × months × FTE + buyout (22.5% of annual base if converted before 1,040 hrs) − § 41 credit (65% × spend × 7.9%, if R&D) Offshore = rate × 160 hrs × months × FTE × 1.18 + § 174 drag (billing × 21% × 29/30, if R&D) Marketplace= $68 × hours − § 41 credit (if R&D) Turnkey NPD= $165 × hours − § 41 credit (if R&D)

Offshore rates follow the discipline: $14/hr for 2D drafting and BIM, $18/hr for 3D CAD and PCB/controls CAD, $26/hr for FEA and CFD. The § 41 credit on US contractor spend assumes the contract leaves you the substantial rights and the financial risk; see the funded-research note on the R&D calculator.

02Worked example: three mechanical engineers for 12 months

Defaults: $60/hr base, 52% markup, no conversion, work qualifies as R&E.

3 FTE × 12 months, mechanical / SolidWorks
ModelGrossAdjustmentsLanded
US staffing agency$569,088− $29,224 § 41 credit$539,864
Offshore 3D CAD FTE$103,680+ $18,662 QA + $21,047 § 174 drag$143,389
Freelance marketplace$424,320− $21,789 § 41 credit$402,531
Turnkey US NPD firm$1,029,600− $52,870 § 41 credit$976,730

The offshore route is cheapest on paper by about $396,000, but only if the work can be specified tightly, redlined within the 18% buffer and kept clear of export-control limits. ITAR-controlled technical data cannot go to foreign persons without authorization, which removes the offshore option entirely for many defense programs; see the aerospace and defense playbook.

03Temp-to-perm conversion fees

Set a conversion month to see the fee. Agency MSAs commonly charge 20%-25% of annualized base salary if you hire the engineer before a threshold, often 520 or 1,040 billed hours. The calculator applies 22.5% before 1,040 hours and switches the engineer to a direct cost of base × 1.3 (benefits and payroll burden) after conversion.

Conversion fee on a $60/hr ($124,800/yr) engineer
Converted atBilled hoursTypical fee
Month 3520$28,080 (22.5%)
Month 5867$28,080 (22.5%)
Month 71,213$0 if the MSA steps down at 1,040 hrs

The negotiation target is a sliding fee printed in the MSA that reaches zero by 520-1,040 hours. See the staffing MSA audit for the clause list.

Benchmarks are typical 2025-2026 market ranges compiled by Engineer Aid, an independent desk not affiliated with the vendors named. Quotes vary by region, volume and timing; nothing here is legal, tax or engineering advice. Revised 2026-11-06.

Questions buyers ask

What is a normal engineering staffing agency markup?

Engineering markups usually run 45% to 62% over the engineer's base pay. At $60/hr base and a 52% markup, the bill rate is $91.20/hr, about $189,700 per full-time year.

Why add 18% to offshore CAD costs?

Offshore drawings still need US senior engineer or PE review. Without redline SLAs and QA checklists that overhead runs 15%-25%; 18% is the planning figure for a well-run engagement.

How does Section 174 change offshore engineering cost?

Domestic research and experimental spend is deductible in year one under Section 174A, but foreign R&E must be amortized over 15 years, with only 3.33% deducted in year one. At a 21% tax rate that is a year-one cash cost of about 20.3% of the foreign spend.

Can I claim the R&D credit on agency or freelance engineers?

Generally 65% of US contractor spend can count as qualified research expense if you keep substantial rights to the results and bear the risk of failure. Foreign contractor spend does not qualify.

Related sheets

C-05 · Staffing markup comparisonActalent vs. Aerotek vs. Kelly Engineering vs. Randstad: Bill Rate Markups & Temp-to-Perm Buyout FeesEngineering staffing markups run 45%-62% on pay: $60/hr base becomes $91.20 at 52%. Compare Actalent, Aerotek, Kelly and Randstad on markup and buyoutC-06 · Offshore CAD comparisonIndovance vs. IndiaCADworks vs. Alpha CAD Service: Dedicated CAD/BIM FTE Rates, QA Buffers & SLAsOffshore CAD FTEs benchmark at $2,240-$4,160/month ($14-$26/hr). Add an 18% US QA buffer and, for R&D work, a 20.3% Year-1 Sec. 174 tax drag. Full matA-09 · Offshore FTE auditIndovance CAD and BIM Outsourcing Audit: Dedicated FTE Monthly Pricing, Revision SLAs and Data SecurityAudit a dedicated offshore CAD/BIM FTE contract: $2,240-$4,160 monthly benchmarks, 18% US QA buffer, revision SLAs, ISO 27001 and Sec. 174 drag.P-05 · Controls playbookIndustrial OEM, Robotics & PLC Controls Engineering Playbook: Commissioning Rates, Travel Per-Diems & Staffing MSAsControls and commissioning engineers bill $72-$165/hr plus overtime, per diem and travel time. Worked 3-week site model, MSA rate-card terms and safetJ-18 · India rate cardIndia Engineering GCC & CAD/FEA BPO Hub (Pune, Bengaluru, Hyderabad, Chennai): 2026 FTE Rate Cards, ISO 27001 Audits & Attrition SLAsIndia engineering rate card: 2D CAD $12-$18/hr, 3D and FEA $20-$32/hr, $1,950-$3,600 per FTE-month, GCC vs BPO, ISO 27001, attrition SLAs and US Sec. J-10 · Regional corridor guideOhio & Pennsylvania Industrial Corridor: COA Firm Licensing, Heavy Equipment FEA/CAD Outsourcing & PE Stamp BenchmarksOhio and Pennsylvania buyer guide: firm COA rules, PE stamp math ($2,600 per skid, $425 per extra state), $18-$26/hr offshore FEA and state R&D credit

Dispatch · enquiry

Send it to an independent auditor

Tell us what you are buying or renewing. Calculator results arrive here automatically, so there is nothing to retype. We reply from hello@engineeraid.com, usually within one business day.

  • Benchmark and redline review of a quote, MSA or engagement letter
  • Target price and a 2-3 vendor RFP scope
  • No sales calls from vendors: we are not a reseller or agency

By sending, you agree we may reply to the email given. See the privacy policy.