ENGINEERAID

Tool 04 · R&D credit

IRC Section 41 R&D tax credit, Section 174A and contingency fee audit calculator

Enter engineering wages, supplies, contractor spend and project count. The calculator estimates federal and state credits, the year-one tax cost of offshore R&E, the funded-research risk from your contract mix, and the difference between a contingency fee and a fixed-fee study.

Sheet codeG-06
Sheet006 / 062
Revision2026-11-06
DisciplineCalculators
~7.9%
Federal net credit on total QRE
ASC 14% × 79% (§ 280C)
65%
Share of US contractor spend that counts
foreign contractors: 0%
$8,500 + $1,200
Fixed-fee study per business component
vs 20%-30% contingency

01The arithmetic

Total QRE = W-2 wages + supplies + 0.65 × US contractors Federal ≈ 0.079 × QRE State ≈ effective state yield × QRE Contingency = 25% (or 20%) × (federal + state) Fixed fee = $8,500 + $1,200 × business components Foreign R&E year-1 drag = offshore × 21% × (1 − 1/30)

The 7.9% federal figure approximates the Alternative Simplified Credit for a company whose QREs are steady or growing; the effective net yield usually lands between 6.5% and 9.2%. State yields in the tool are effective estimates on total QRE, lower than headline rates because most state credits are incremental.

Worked example: California engineering firm
LineArithmeticResult
Total QRE$1.8M + $150K + 65% × $300K$2,145,000
Federal credit7.9% × $2,145,000$169,455
California credit (est.)5.5% × $2,145,000$117,975
25% contingency fee25% × $287,430$71,858
Fixed-fee study, 8 components$8,500 + 8 × $1,200$18,100
Fee saving$71,858 − $18,100$53,758

02Funded research: the T&M trap

Under IRC § 41(d)(4)(H), research funded by another party does not qualify. For engineering firms, the test turns on the contract: if you are paid regardless of whether the work succeeds (time-and-materials, cost-plus) or you do not keep substantial rights to the results, the IRS treats the research as funded. Fixed-price contracts where you bear the risk of failure are the usual safe harbor.

The calculator flags risk from your revenue mix and shows how much credit would be exposed to challenge. Before the study, sort contracts into fixed-price and T&M and read the payment and IP clauses of the largest ones.

03Form 6765 Section G and why it changes the fee model

Form 6765 now asks for business-component level detail: which projects, what wages and supplies were allocated to each, and the information sought. That favours studies built from engineering records (design iterations, test results, change logs) over blanket payroll percentages. A fixed-fee study priced per business component tracks the real work; a contingency fee grows with the size of the claim regardless of effort.

Contingency vs fixed fee at different credit sizes
Gross credit25% contingencyFixed fee (8 components)Difference
$100,000$25,000$18,100$6,900
$287,430$71,858$18,100$53,758
$500,000$125,000$18,100$106,900

More detail on the A&E and custom-machine case is in the Form 6765 substantiation playbook. Estimates only; confirm your position with a CPA.

Benchmarks are typical 2025-2026 market ranges compiled by Engineer Aid, an independent desk not affiliated with the vendors named. Quotes vary by region, volume and timing; nothing here is legal, tax or engineering advice. Revised 2026-11-06.

Questions buyers ask

How much is the federal R&D credit worth for an engineering firm?

Under the Alternative Simplified Credit, the net federal credit after the Section 280C reduction is roughly 6.5% to 9.2% of total qualified research expenses, about 7.9% for a typical steady or growing company.

Do offshore engineering contractors count toward the R&D credit?

No. Research conducted outside the United States is excluded from qualified research expenses, and foreign research spend must be amortized over 15 years under Section 174.

Is a 25% contingency fee normal for an R&D study?

Contingency fees of 20% to 30% of the credit are common, but a fixed-fee study priced per business component is often far cheaper on larger claims: for a $287,000 credit, a 25% fee is about $71,900 versus about $18,100 fixed for eight components.

Can engineering firms claim R&D credits on client work?

Only if the research is not funded: typically the contract must be fixed-price with payment contingent on success and the firm must keep substantial rights. Time-and-materials and cost-plus work is usually treated as funded research under § 41(d)(4)(H).

Related sheets

C-12 · R&D credit fee comparisonContingency-Fee R&D Tax Credit Firms (25%) vs. Fixed-Fee PE-Led Form 6765 Studies: Cost & IRS Audit RiskA 25% contingency fee on a $230,535 R&D credit is $57,634; a fixed-fee study for 8 projects is $18,100. Breakeven is a $72,400 credit. Form 6765 auditC-06 · Offshore CAD comparisonIndovance vs. IndiaCADworks vs. Alpha CAD Service: Dedicated CAD/BIM FTE Rates, QA Buffers & SLAsOffshore CAD FTEs benchmark at $2,240-$4,160/month ($14-$26/hr). Add an 18% US QA buffer and, for R&D work, a 20.3% Year-1 Sec. 174 tax drag. Full matP-09 · R&D credit playbookA&E and Custom Manufacturing IRC Section 41 Playbook: Surviving IRS Funded-Research Audits & Form 6765 Section GHow A&E and custom manufacturers survive IRC 41(d)(4)(H) funded-research audits and Form 6765 Section G. Worked QRE model, contract review and fee comJ-02 · State guide: CaliforniaCalifornia (BPELSG) Engineering Guide: Seismic and Surveying Exams, DSA and HCAI SE Rules, PE Stamp Costs and the CA R&D CreditCalifornia BPELSG guide: PE vs SE authority, state seismic and surveying exams, 1.35x stamp fee math on a $3,800 floor, staffing rates and the CA 15% J-08 · Corridor guide: MassachusettsMassachusetts and the Boston Corridor: MedTech ISO 13485 NPD Rates, Robotics Staffing Markups and the MA 10% R&D Tax CreditMassachusetts corridor guide: ISO 13485 NPD firm rates near $165/hr, robotics staffing markups, lab fit-out PE seal math, construction control and theJ-12 · Mountain West guideColorado (DORA) & Arizona (BTR) Corridor: High-Snow/Solar PV PE Stamping, Semiconductor Fab Staffing & AZ 24% R&D CreditColorado DORA and Arizona BTR guide: solar PE letters at $350 or $195 per site, $425 per extra state, fab staffing rates and Arizona's 24%/15% R&D cre

Dispatch · enquiry

Send it to an independent auditor

Tell us what you are buying or renewing. Calculator results arrive here automatically, so there is nothing to retype. We reply from hello@engineeraid.com, usually within one business day.

  • Benchmark and redline review of a quote, MSA or engagement letter
  • Target price and a 2-3 vendor RFP scope
  • No sales calls from vendors: we are not a reseller or agency

By sending, you agree we may reply to the email given. See the privacy policy.